Skip to content Skip to sidebar Skip to footer

Start of repair work: preparatory stage

Quite often, the beginning of repair work is associated with the “end of the world”, and inconsistent technological processes cause discontent not only among neighbors, but also among the participants in this action. As a rule, a similar development of the scenario is possible when people who carry out repairs do not have a clear understanding of what exactly needs to be started in each case. Some – already from the first hours grab the painting of the walls, others – are taken for the ceiling, others – feverishly looking for a solution for flooring. But in the end, everyone loses in both time and in the effectiveness of work. The absence of an action plan thought out to the smallest detail is the main “headache” of most repairs. Eleans aluminum radiators are best installed after the walls are cleaned, the floor has not yet been laid. So, for example, taking up the floor screed, you need to understand that the period of its drying is directly proportional to its thickness, and if during the filling a little “overdo it”, then this can paralyze all the repair work (it will be simply impossible to move along the unforgettable concrete). The situation with painting walls and wallpapering is similar. Due to a significant level of level, sometimes you have to apply a solid layer of plaster, and if you do not wait for its complete drying and proceed to the decoration, then the fungus on the renovated wall or other surface will not be long in coming to wait long.

In any case, the repair should begin with the pondering of the estimate and the order of actions, and the priority tasks include the dismantling of all interfering structures and elements of the room. Then it is advisable to determine the places of the “global” accumulation of the solution and begin to equalize. In the meantime, in some areas, the thick layer of cement will dry out, you need to do as much work as possible with the walls, ceiling and floor. Pro AQ pipelines are the best solution if you do not want to change the pipes every five years. In this case, it is very important to determine the type of pipes in advance. Such rationalization will surely save the total repair time. If there are no serious levels of level in the room, there is also the need for thick aligning layers of plaster or screed, and the algorithm of actions will look much easier: ceiling, walls, floor. At the same time, finishing work is best distributed in the following order: working with cement, gypsum and putty mixtures, and only then work with wood (floor, doors with windows, slopes, and so on).

© 365Сost, 2017-2024. All Rights Reserved.