The need for the construction of a fence from corrugated board can be carried out with your own hands without the help of hired workers. First you need to develop a plan of the future design and calculate the number of necessary materials.

The need for the construction of a fence from corrugated board can be carried out with your own hands without the help of hired workers. First you need to develop a plan of the future design and calculate the number of necessary materials.

As a rule, for the fence, two types of cornfields are used for the facade, aluminum-tyed for a sword from neighboring houses.

For the construction of the fence, it is necessary to prepare everything that may be needed in the work: pipes of a certain section, gate, gate, horizontal crossbars, frames for gates, and for gate, and t.

Now you can start building fences from corrugated board. First put the corner from which the entire fence is built from. To install this corner pillar, drill a pit into a depth of about 1 m, become a pillar and concrete.

After the concrete freezes by the corner, mark the territory for other pillars. Celebrate the horizontal, according to which in the future it will be appropriate to measure the top of the remaining pillars. For this action, a water level with a 20 meter length tube is completely suitable. Pull the thread on the previously planned markings and concrete wells. It is very important that all the pillars need to be painted, otherwise they will rust, which will inevitably affect the quality of the fence.

Cut horizontal jumpers and tightly, weld them tightly. Note that jumpers are welded not to the pillars themselves, but between them. Practice shows that such a welding method adds the entire aesthetics structure. Following, clean up all welding joints, paint the place where the paint was damaged during the welding process.

After that, with special roofing self -tapping screws, screw the cut to the centers of the pillars, and sheathe the fence with a corrugated board, which in the same way attach to the frame elongated self -tapping screws.

A gate and gate are welded to the pillars, it is necessary to check how everything opens up.