What is required?
– Level, bitumen, reinforced concrete tiles, fine -grained glue, reinforced concrete belt
Instructions
– In order to build from aerated concrete by all the rules, it is necessary to first find out about some of its properties. So, aerated concrete blocks have a fairly high heat supply, which involves their use in conditions of harsh climate. In addition, in thickness, aerated concrete walls are usually 30 cm. Consequently, to carry out construction using aerated concrete blocks means saving on the area.
– Still, if we carry out construction with brick, for example, then in the thickness of the wall there must be 1.2 m.. To build a house from aerated concrete, you do not need to have any special technology. Blocks just cut and drill. So, first you need to prepare a construction site. On your own, you need to clear the terrain and invite professionals-geodeasyists to take the necessary measurements.
– To know exactly how to properly conduct construction with aerated concrete, the presence of a surveyor is desirable. Profi will be able to determine the correct arrangement of the axes of the future structure, and will also be able to set the floor level under the first floor. In addition, before starting construction, it is necessary to carry out all technical communications. Then start laying the foundation.
– A reinforced concrete slab is ideal for aerated concrete blocks. She will be able to provide uniform and smallest shrinkage destruction. In addition to a reinforced concrete slab, a pillar foundation can be taken as a basis for the structure. It is simply necessary to be covered with a reinforced concrete belt or you can apply a strip foundation, it is most suitable for a sandy surface.
– After the foundation has been determined and laid, it is necessary to proceed to laying the blocks. It is worth remembering that masonry of gas concrete blocks is very different from standard masonry. Not everyone knows how to conduct construction with aerated concrete. So, aerated concrete blocks in the traditional way do not fit, like say the walls of brick.
– Blocks made of aerated concrete MB are laid immediately, without unnecessary pauses, which are inevitable when laying brick, since it takes time for strong grasping the material. The gas concrete external walls should be 380 mm in thickness, and the partition is not more than 250 mm.
– Although, decorative interior partitions are often used, in the thickness of which are 100 mm. Before you start laying blocks of aerated concrete, you need to lay out a waterproofing material, say bitumen. Laying must be done using fine -grained glue, which will make it possible to save enough well and prevent bloating from the cold.